Ive called my railway the Rickety Shed Light Railway
because thats where it all started. The shed has now finally departed in a skip but the name has stuck. Having aborted the first outdoor (mk2) design, mk3 was completed to a running condition in 2003 and many a happy running session followed. Progress to this point can be found on my old website here.
2007 brings a house move so the mk3 layout track has been pulled up. A new house brings a new direction which in my case takes me to a more accurate model of part of the Southwold Railway and a move to 45mm gauge track whilst retaining the 16mm to 1 foot scale. This website will document progress.
Sep 2011
Updates to the Outside pages showing progress made on Walberswick and Blythburgh stations.
Apr 2011
I've added a biblography of publications about the Southwold Railway or containing Southwold Railway related articles.
Oct 2010
Having extended the line, a few pages added detailing the trackbed construction methods.
Feb 2010
Work starts on some models of the coaches proposed for the reinstatement of the railway.
June 2009
Walberswick station base completed and track laid, bridge set in final position and track laid between the two stations.
June 2008
Southwold base complete and track laid. First train runs! For pictures of the construction click the Outside "door" then Southwold.
May 2008
Construction starts. Having excavated the area for Southwold station, footings are poured and brick laying commences.